
Sports tennis artificial grass
-
$11.00200-999 Square Meter
-
$9.201000-9999 Square Meter
-
$8.00≥10000 Square Meter
- Transportation:
- Ocean, Land, Air, Express
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | China |
---|---|
Productivity: | 100000 Square Meter/Square Met |
Supply Ability: | 100000 Square Meter/Square Meters per Month |
Payment Type: | L/C,T/T,Paypal,Others |
Incoterm: | FCA,FAS,EXW,CIF,CFR,FOB,DDU |
HS Code: | 54049000 |
Transportation: | Ocean,Land,Air,Express |
Product Description
Product Description
Tennis court artificial turf construction steps first is the foundation selection. Tennis court artificial turf whether cement concrete foundation or asphalt foundation need to ensure that the slope error control in the range of 3 ‰ -5 ‰, tennis court artificial turf slope according to the increase of the de-watering system and increase, and tennis court artificial turf construction site to have a drainage system.
It should be noted that the tennis court 10% cement stone powder foundation maintenance up to standard after paving artificial turf.
Tennis court artificial turf foundation construction, need to be put into the expansion joints and special caulking material sealing, tennis court central filling expansion joints is to avoid cold and hot expansion caused by expansion of dry cracks. After that is the tennis court foundation after the completion of the drying process, as well as de-watering test, the test standard for any water wang water depth can not exceed the thickness of a coin, if more than the thickness of a coin needs to be filled with cement repair to make it flat.
Then succinctly summarize the tennis court artificial turf construction steps precautions. Tennis court artificial turf foundation construction is the foundation maintenance time is not enough or the moisture content is greater than 5%, as well as the foundation is not cleaned up can not be site construction. Secondly, the repair construction steps is now the artificial turf spread out, trimming adjustments, bonding joints cloth need to keep the lawn in the same direction.
One of the filling quartz sand and rubber particles need to pay attention to is, filling, spreading speed should be uniform, not too fast, not too slow, must be even speed spreading, spreading thickness should be uniform, not appear high and low uneven phenomenon, in the spreading of filler now need to be dry, after drying and then spreading.
It should be noted that the tennis court 10% cement stone powder foundation maintenance up to standard after paving artificial turf.

Then succinctly summarize the tennis court artificial turf construction steps precautions. Tennis court artificial turf foundation construction is the foundation maintenance time is not enough or the moisture content is greater than 5%, as well as the foundation is not cleaned up can not be site construction. Secondly, the repair construction steps is now the artificial turf spread out, trimming adjustments, bonding joints cloth need to keep the lawn in the same direction.

Tennis court artificial turf fence construction steps mainly include the following three steps: tennis court base with concrete fence post base, and with cement concrete connecting net columns and piers; and then is the tennis court frame, with two steel pipe welded into, and with special tools for tightening, or use screws to fix; tennis court artificial turf pavement.
Explore our comprehensive range of sports surfaces, including Football Field Artificial Grass, Rugby Field Synthetic Grass, and more, to provide students with superior athletic opportunities.