Shenzhen Maijie Automation Equipment Co., Ltd.
Shenzhen Maijie Automation Equipment Co., Ltd.
High quality round knife sharpener
  • High quality round knife sharpener
High quality round knife sharpener

High quality round knife sharpener

Transportation:
Ocean
Port:
Yantian Port, Shenzhen
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 300 units/year
Supply Ability: Sufficient supply
HS Code: 8515190010
Transportation: Ocean
Port: Yantian Port, Shenzhen
Product Description
Product Description

High quality round knife sharpener

Model: MJ-M2025S Sharpening Machine
Product name: water type sharpener
Power voltage: AC 220V 1KW
Attribute: PCB circuit board hand push cutting machine special model
Installed power: 0.5KW
Material: Alloy knife sharpener
Blade motor speed: 100 rpm
Speed of whetstone motor: 2800 rpm


High quality round knife sharpener

Installation and use conditions>
●Working voltage: AC220V±10%
●Ambient temperature: 5~40°C
●Relative humidity: no more than 85%RH
●Power switch: air switch
●Installed power: 1KW
●The ground is flat, and there should be no strong vibration and corrosive gas in the surrounding environment


1

2

Workshop shots

3

Item display

4

About delivery
All the equipment of the company includes freight and distribution fees, excluding the cost of going upstairs, depending on the distance, choose logistics consignment or door-to-door delivery
On-site installation and commissioning
The company is responsible for distribution, and there are professional engineers on-site installation, commissioning, training, or guidance and assistance through remote video or telephone
1 year warranty
After-sales promises that all parts of the wave soldering machine are guaranteed for one year, except for human problems
Lifetime service
The company provides life-long maintenance, paid service, only labor costs and material costs



Preparation before installation and commissioning
1. Door-to-door time: within 2 working days after all the following work is ready, special circumstances will be discussed separately
2. Logistics transportation: After receiving the goods, customers who choose logistics transportation must first place the equipment and prepare all the following materials
3. Home delivery: Customers who choose home delivery need to reserve space in advance to prevent equipment and prepare all the following materials
Material preparation:
1. Power connection: lead the power cord to the device according to the requirements of the device, leaving a length of more than 3 meters to connect to the device
2. Air connection: If there is an air source in the workshop, lead the air pipe to the side of the equipment, leaving a length of more than 3 meters to connect to the equipment. If there is no air source in the workshop, you need to prepare the air compressor in advance and prepare the necessary accessories
3. Tin bar: Prepare enough tin bars in advance according to the tin capacity requirements of the equipment, so that the master can directly melt the tin for on-site trial welding test and training when he comes to the door.
4. Flux: the flux that needs to be used when the product is ready for trial welding. At least 2 liters required for testing
5. Cleaning agent: the nozzle used to clean the flux, temporarily not used, it will not affect the debugging

Send your message to this supplier

  • Mr. Zhang Peter

  • Enter between 20 to 4,000 characters.