
Recommended desktop small tin furnace
- Transportation:
- Ocean
- Port:
- Yantian Port, Shenzhen
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 300 units/year |
Supply Ability: | Sufficient supply |
HS Code: | 8515190010 |
Transportation: | Ocean |
Port: | Yantian Port, Shenzhen |
Recommended desktop small tin furnace
Model: MJ-101 desktop |
Tin pot specification: 100* 100*45mm |
Melting tin volume: 3.5KG |
Temperature range: 0-600 degrees |
Power: 600W |
Dimensions: 330*150*120mm |
Voltage power: AC220V 600W |
Control mode: digital display, automatic constant temperature |
product details
Military Grade High Quality Furnace
The furnace liner is made of imported military-grade high-quality titanium plate, which is corrosion-resistant, acid-resistant, and non-stick tin
Dual temperature digital display
The thermostat adopts PID self-tuning technology, with a temperature error of ±2°C, and has a temperature compensation function to ensure that the displayed temperature is consistent with the actual temperature
Appearance chassis
The appearance adopts 1.5mm iron plate, which is sturdy and durable, and the surface is sprayed with beige paint
Built-in dross tank
Equipped with built-in tin dross tank, removable type, easy to clean tin dross
Multi-directional cooling holes
There are radiating holes on the left and right sides and the bottom, with strong cooling effect, quiet operation and reasonable design
Matters needing attention>
1. Check whether the power supply voltage is consistent before using the tin melting furnace
2. It is strictly forbidden to move the tin melting furnace after it is energized, and it is not allowed to knock, disassemble and install its electric heating parts.
3. It is recommended that the temperature of the first melting tin be set to about 250 degrees, and the tin solder bar is used to apply tin on the bottom of the heated tin furnace tank until the tin surface covers the tin tank. When the tin bar starts to melt, it should be added in time until the molten tin surface reaches a suitable height. If there is no solder in the tin melting furnace, do not use the tin melting furnace to energize and heat
4. After use, the power should be turned off, and the tin melting furnace should not be energized to heat up when unattended
Daily maintenance>
1. Every day, when the work is finished, be sure to clean the oxides in the tin bath to keep the tin bath and the tin furnace shell clean for a long time
2. When adjusting the temperature parameters and pressing the switch, be careful not to use too much force to avoid damage to the switch. The tin in the tin bath should be kept in sufficient quantity, because the temperature sensing point is about the middle height of the tin bath, and too little molten tin will cause temperature detection deviation
Free warranty period: 12 months
Warranty scope: all accessories of the whole machine
Warranty method: telephone communication, mail accessories guide replacement; door-to-door service
Installation and debugging: on-site installation and debugging or remote assistance in installation and debugging
After-sales response time: mail accessories (sent within 1 hour), door-to-door] service (departure within 4 hours of working time)
Workshop shots
Item display
About delivery
All the equipment of the company includes freight and distribution fees, excluding the cost of going upstairs, depending on the distance, choose logistics consignment or door-to-door delivery
On-site installation and commissioning
The company is responsible for distribution, and there are professional engineers on-site installation, commissioning, training, or guidance and assistance through remote video or telephone
1 year warranty
After-sales promises that all parts of the wave soldering machine are guaranteed for one year, except for human problems
Lifetime service
The company provides life-long maintenance, paid service, only labor costs and material costs
Preparation before installation and commissioning
1. Door-to-door time: within 2 working days after all the following work is ready, special circumstances will be discussed separately
2. Logistics transportation: After receiving the goods, customers who choose logistics transportation must first place the equipment and prepare all the following materials
3. Home delivery: Customers who choose home delivery need to reserve space in advance to prevent equipment and prepare all the following materials
Material preparation:
1. Power connection: lead the power cord to the device according to the requirements of the device, leaving a length of more than 3 meters to connect to the device
2. Air connection: If there is an air source in the workshop, lead the air pipe to the side of the equipment, leaving a length of more than 3 meters to connect to the equipment. If there is no air source in the workshop, you need to prepare the air compressor in advance and prepare the necessary accessories
3. Tin bar: Prepare enough tin bars in advance according to the tin capacity requirements of the equipment, so that the master can directly melt the tin for on-site trial welding test and training when he comes to the door.
4. Flux: the flux that needs to be used when the product is ready for trial welding. At least 2 liters required for testing
5. Cleaning agent: the nozzle used to clean the flux, temporarily not used, it will not affect the debugging
Related Keywords