Shenzhen Maijie Automation Equipment Co., Ltd.
Shenzhen Maijie Automation Equipment Co., Ltd.
High quality automatic Board out machine
  • High quality automatic Board out machine
High quality automatic Board out machine

High quality automatic Board out machine

Transportation:
Ocean
Port:
Yantian Port, Shenzhen
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 300 units/year
Supply Ability: Sufficient supply
HS Code: 8515190010
Transportation: Ocean
Port: Yantian Port, Shenzhen
Product Description
Product Description

Automatic Board out machine


Model: MJ-CB400
Belt width: 400mm
Power supply: single-phase 220VAC 50Hz
Dimensions: 1200 (L) *480 (W)mm
Power: 60W
Material: The belt bracket is made of aluminum alloy
Speed: 0-2M adjustable
Base frame material: aluminum (square pass) welded
Net weight: 40KG
Height: adjustable

Automatic Board out machine

product details

Axial fan
Equipped with three axial fans to cool the hot plate from wave soldering

motor
The motor specifications are determined according to the load of the fuselage, and are controlled by imported motors, which ensure stable and reliable operation.

Governor
The speed governor is used to adjust the running speed of the conveyor belt. The normal speed is 0-2 meters per minute. Different speeds require different power inverters, which is simple and convenient.

Conveyor belt fastening
Adjusting the tightness of the conveyor belt makes the conveyor belt run better, which is convenient for replacing or cleaning the belt, and the operation is simple

Conveyor belt
PVC conveyor belt is anti-static and wear-resistant

Screw
The design of the screw rod is to adjust the height of the conveyor, the two heads can be adjusted, and the height can be fixed according to the needs.

Feet
Good stability, easy to move, you can also choose to try a fixed foot pad according to your needs, simple and convenient

Installation and use conditions>
●Working voltage: AC220V 50Hz
●Ambient temperature: 5~40°C
●Relative humidity: no more than 85%RH
●Power switch: air switch
●Installed power: 0.1KW
●The ground is flat and there should be no strong vibration and corrosive gas in the surrounding environment


1

2

Workshop shots

3

Item display

4

About delivery
All the equipment of the company includes freight and distribution fees, excluding the cost of going upstairs, depending on the distance, choose logistics consignment or door-to-door delivery
On-site installation and commissioning
The company is responsible for distribution, and there are professional engineers on-site installation, commissioning, training, or guidance and assistance through remote video or telephone
1 year warranty
After-sales promises that all parts of the wave soldering machine are guaranteed for one year, except for human problems
Lifetime service
The company provides life-long maintenance, paid service, only labor costs and material costs



Preparation before installation and commissioning
1. Door-to-door time: within 2 working days after all the following work is ready, special circumstances will be discussed separately
2. Logistics transportation: After receiving the goods, customers who choose logistics transportation must first place the equipment and prepare all the following materials
3. Home delivery: Customers who choose home delivery need to reserve space in advance to prevent equipment and prepare all the following materials
Material preparation:
1. Power connection: lead the power cord to the device according to the requirements of the device, leaving a length of more than 3 meters to connect to the device
2. Air connection: If there is an air source in the workshop, lead the air pipe to the side of the equipment, leaving a length of more than 3 meters to connect to the equipment. If there is no air source in the workshop, you need to prepare the air compressor in advance and prepare the necessary accessories
3. Tin bar: Prepare enough tin bars in advance according to the tin capacity requirements of the equipment, so that the master can directly melt the tin for on-site trial welding test and training when he comes to the door.
4. Flux: the flux that needs to be used when the product is ready for trial welding. At least 2 liters required for testing
5. Cleaning agent: the nozzle used to clean the flux, temporarily not used, it will not affect the debugging

Send your message to this supplier

  • Mr. Zhang Peter

  • Enter between 20 to 4,000 characters.