
High-quality Economical reflow soldering
- Transportation:
- Ocean
- Port:
- Yantian Port, Shenzhen
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 300 units/year |
Supply Ability: | Sufficient supply |
HS Code: | 8515190010 |
Transportation: | Ocean |
Port: | Yantian Port, Shenzhen |
Economical reflow soldering
Due to the continuous miniaturization of PCB boards of electronic products, chip components have appeared, and traditional soldering methods can no longer meet the needs. At first, only the reflow soldering process was used in the assembly of hybrid integrated circuit boards, and most of the components to be assembled and soldered were chip capacitors, chip inductors, mounted transistors and diodes. With the development of the entire SMT technology becoming more and more perfect, and the emergence of a variety of chip components (SMC) and mount devices (SMD), the reflow soldering process technology and equipment as part of the placement technology has also been developed accordingly, and its applications are becoming more and more extensive. Almost all electronic products have been applied

Product features
1. With temperature tolerance, fault diagnosis, sound and light alarm functions.
2. Modular design of the heating zone, convenient maintenance and disassembly, independent small circulation air transport design, upper and lower heating methods, good thermal compensation, high thermal efficiency, power saving, plus
Fast temperature speed, suitable for welding of high-quality products such as BGA and CSP components, special forced hot air circulation structure system, so that PCB and components are heated evenly and efficiently
High and fast heating speed.
3. The air transport system adopts advanced air duct design, uniform air transport and high heat exchange efficiency.
4. The preheating zone, welding zone and cooling zone are heated independently up and down, cycled and temperature controlled independently. The temperature difference between adjacent temperature zones can reach up to 100℃.
The temperature and wind speed of the zone can be adjusted independently.
5. The power of each temperature zone is properly matched, and the temperature rises quickly, from room temperature to set working temperature about 15 minutes. And has fast and efficient thermal compensation performance.
6. Modular design, compact structure, convenient maintenance.
7. With independent roller structure and topping support, combined with stainless steel mesh belt, it runs smoothly and is durable and wear-resistant. Long-term use is not easy to change.
Installation and use conditions
<1>Working voltage: AC380V±10%; three-phase five-wire system; 50Hz, can also be connected to 220V.
<2> Ambient temperature: 5~40℃;
<3>Relative humidity: not more than 85%RH;
<4>Power switch: air switch
<5>Installed power: 18KW
<6>The ground is flat, and there should be no strong vibration and corrosive gas in the surrounding environment.
Reflow soldering process
Printed board preparation-solder paste preparation-printing solder paste-mounting post-chip components-through reflow soldering-soldering completion-testing-shaping and trimming-completion
Company strength
Workshop shots
Item display
About delivery
All the equipment of the company includes freight and distribution fees, excluding the cost of going upstairs, depending on the distance, choose logistics consignment or door-to-door delivery
On-site installation and commissioning
The company is responsible for distribution, and there are professional engineers on-site installation, commissioning, training, or guidance and assistance through remote video or telephone
1 year warranty
After-sales promises that all parts of the wave soldering machine are guaranteed for one year, except for human problems
Lifetime service
The company provides life-long maintenance, paid service, only labor costs and material costs
Preparation before installation and commissioning
1. Door-to-door time: within 2 working days after all the following work is ready, special circumstances will be discussed separately
2. Logistics transportation: After receiving the goods, customers who choose logistics transportation must first place the equipment and prepare all the following materials
3. Home delivery: Customers who choose home delivery need to reserve space in advance to prevent equipment and prepare all the following materials
Material preparation:
1. Power connection: lead the power cord to the device according to the requirements of the device, leaving a length of more than 3 meters to connect to the device
2. Air connection: If there is an air source in the workshop, lead the air pipe to the side of the equipment, leaving a length of more than 3 meters to connect to the equipment. If there is no air source in the workshop, you need to prepare the air compressor in advance and prepare the necessary accessories
3. Tin bar: Prepare enough tin bars in advance according to the tin capacity requirements of the equipment, so that the master can directly melt the tin for on-site trial welding test and training when he comes to the door.
4. Flux: the flux that needs to be used when the product is ready for trial welding. At least 2 liters required for testing
5. Cleaning agent: the nozzle used to clean the flux, temporarily not used, it will not affect the debugging
Related Keywords