Shenzhen Maijie Automation Equipment Co., Ltd.
Shenzhen Maijie Automation Equipment Co., Ltd.
High-quality foot-operated pneumatic spray furnace
  • High-quality foot-operated pneumatic spray furnace
High-quality foot-operated pneumatic spray furnace

High-quality foot-operated pneumatic spray furnace

Transportation:
Ocean
Port:
Yantian Port, Shenzhen
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 300 units/year
Supply Ability: Sufficient supply
HS Code: 8515190010
Transportation: Ocean
Port: Yantian Port, Shenzhen
Product Description
Product Description

High-quality foot-operated pneumatic spray furnace

Model: MJ-DP340 Pneumatic spray furnace
Liner specification: 340*250* 150mm
Power supply: 220V 50HZ 50W
Dimensions: 410* 320* 650mm
Atomized average particle size: 100um
Nozzle diameter: 1.3mm
Water spray volume: 0-360ml/min
The distance between the nozzle and the product: 20-30cm
Flat blowing width: 200mm at a height of 200mm; 320mm at a height of 300mm

Circular blowing width: 200mm height 70mm diameter; 300mm height 80mm diameter


High-quality foot-operated pneumatic spray furnace

product details

Spray tank
The surface is easy to clean and has a long service life
Strong anti-corrosion ability

Imported solid nozzle
Fine and uniform spray particles, good atomization effect

Appearance chassis
1.2mm iron plate is made of thick and firm surface sprayed with high temperature resistant paint

Casters with brake
Movable casters with brakes for easy movement

Electromagnetic pump
No need to connect an external air compressor to spray more power

Filter tip
Effectively filter impurities

Side switch
Used to store and recycle flux
Easy to backwash

Foot switch
With a foot switch
Fast and sensitive to improve work efficiency

Common faults and maintenance
Flux spray furnace

①If the nozzle cannot spray flux
If the nozzle does not spray flux, it may be that the nozzle is blocked or the pump is broken. Judgment method: Disassemble the nozzle and spray water. If there is water, the nozzle is blocked. Use alcohol to clean the nozzle. If there is no water and there is flux, the pump should be broken and need to be sent back to the manufacturer for repair
② Instructions for use
1. Connect the water pipe to the joint under the flux fuse
2. Put the water inlet pipe into the flux
3. Step on the foot pedal to spray flux automatically, release the pedal to stop spraying
③Maintenance method
After use, use alcohol instead of flux and spray it for half a minute. When using it, pay attention to the surface of the machine and clean it regularly.


1

2

Workshop shots

3

Item display

4

About delivery
All the equipment of the company includes freight and distribution fees, excluding the cost of going upstairs, depending on the distance, choose logistics consignment or door-to-door delivery
On-site installation and commissioning
The company is responsible for distribution, and there are professional engineers on-site installation, commissioning, training, or guidance and assistance through remote video or telephone
1 year warranty
After-sales promises that all parts of the wave soldering machine are guaranteed for one year, except for human problems
Lifetime service
The company provides life-long maintenance, paid service, only labor costs and material costs



Preparation before installation and commissioning
1. Door-to-door time: within 2 working days after all the following work is ready, special circumstances will be discussed separately
2. Logistics transportation: After receiving the goods, customers who choose logistics transportation must first place the equipment and prepare all the following materials
3. Home delivery: Customers who choose home delivery need to reserve space in advance to prevent equipment and prepare all the following materials
Material preparation:
1. Power connection: lead the power cord to the device according to the requirements of the device, leaving a length of more than 3 meters to connect to the device
2. Air connection: If there is an air source in the workshop, lead the air pipe to the side of the equipment, leaving a length of more than 3 meters to connect to the equipment. If there is no air source in the workshop, you need to prepare the air compressor in advance and prepare the necessary accessories
3. Tin bar: Prepare enough tin bars in advance according to the tin capacity requirements of the equipment, so that the master can directly melt the tin for on-site trial welding test and training when he comes to the door.
4. Flux: the flux that needs to be used when the product is ready for trial welding. At least 2 liters required for testing
5. Cleaning agent: the nozzle used to clean the flux, temporarily not used, it will not affect the debugging

Send your message to this supplier

  • Mr. Zhang Peter

  • Enter between 20 to 4,000 characters.