
Customized Cnc Stainless Steel Parts with Shenzhen Factory
- Payment Type:
- T/T, Paypal, Western Union
- Incoterm:
- FOB, CIF
- Min. Order:
- 5 Piece/Pieces
- Min. Order:
- 5 Piece/Pieces
- Delivery Time:
- 8 Days
- Transportation:
- Ocean, Land, Air
- Port:
- Shenzhen
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Shenzhen,China |
---|---|
Productivity: | 20000 Piece/Pieces |
Supply Ability: | 100000 pieces per Month |
Payment Type: | T/T,Paypal,Western Union |
Incoterm: | FOB,CIF |
Certificate: | ISO 9001,ISO 14001 |
Transportation: | Ocean,Land,Air |
Port: | Shenzhen |
Customized Cnc Stainless Steel Parts with Shenzhen Factory
The processing accuracy of CNC machine tools is generally up to 0.05-0.1MM. CNC machine tools are controlled in the form of digital signals. When the CNC device outputs a pulse signal, the moving parts of the machine tool move a pulse equivalent (generally 0.001MM), and the machine tool enters The backlash of the transmission chain and the average error of the screw pitch can be compensated by the CNC device, so the positioning accuracy of the CNC machine tool is relatively high.
We are OEM. Main producetion metal &plastic parts and main business scope is CNC Turning Machining ,CNC Milling Machining,CNC Machining Parts,Plastic Parts,Sheet Metal,Die Casting and so on.
Product images

Product Information:
Material: steel
Color: Custom
Surface treatment: no
Craft: CNC Machining
Tolerance: ±0.01mm
Our Clients


Material: steel
Color: Custom
Surface treatment: no
Craft: CNC Machining
Tolerance: ±0.01mm
YP-MFG brings many years of experience in supplying customized products from Australia, Canada, Italy, France, Germany, Japan, etc.
Information you need to provide
- 2D or 3D drawing
- material
- surface treatment
- quantity
Free quality inspection service
100% inspection before shipment
After sending, we will track the product for you every two days until you get the product.
After receiving the goods, please test and give me feedback. If you have any questions about the problem, please contact us and we will provide you with a solution.
Contact
100% inspection before shipment
After sending, we will track the product for you every two days until you get the product.
After receiving the goods, please test and give me feedback. If you have any questions about the problem, please contact us and we will provide you with a solution.
Related Keywords