
Brass chrome plated push button urinal flush valve
- Payment Type:
- T/T, Paypal, Western Union
- Incoterm:
- FOB, CIF
- Min. Order:
- 300 Piece/Pieces
- Min. Order:
- 300 Piece/Pieces
- Delivery Time:
- 15 Days
- Transportation:
- Ocean, Land, Air, LWE
- Port:
- SHEKOU, SHENZHEN, CHINA
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Jiangmen, Guangdong, China |
---|---|
Productivity: | 10000pcs/month |
Supply Ability: | 10000pcs/month |
Payment Type: | T/T,Paypal,Western Union |
Incoterm: | FOB,CIF |
Certificate: | ISO9001:2008 |
HS Code: | 84818090 |
Transportation: | Ocean,Land,Air,LWE |
Port: | SHEKOU,SHENZHEN,CHINA |
Exposed Urinal Flush Valve is a type of delayed self-closing flush valve, Press button to get water, flushing 6 to 8 seconds, automatic closed. Urinal Flushing System is made of brass, chrome plated.Wall Hung Manual Flush Valvelooks simple, easy to install and operate. Ridge Flush Bath Valve working pressure should be 0.05MPa to 0.9MPa.
Description of Urinal Flush Valve
Name: Push button urinal flush valve
Model No.: HN-7G07
Material: H59 Brass and stainless steel
Surface finished: Chrome plated
Self closing time: flushing 6 to 8 seconds
Size: G1/2" external thread
The thickness of electro plating: 8 to 12 micron
Salt spray testing for 2 kinds of electro plating as follows:
a) General plating: 24 hours / Acid; 120 hours / neutral
b) Acid plating: 48 hours /Acid; 240 hours / neutral
Guarantee time: 2 year
MOQ: 300 pieces
Packaging: Standard export package or Customized
Payment by: T/T, Western Union
Delivery: Shenzhen CHINA, 15 days after payment
Fields of applications: Commercial flush valves. Install on Urinal in public toilet
Service conditions:
1) The working pressure of the product is 0.05MPa-0.9MPa
2) The working temperature is more than 0°
Attention:
1) Please clean the inside of plumbing, like mud or sandy etc before install this Urinal flush valve.
2) This product is passed function test, please don`t dismantle the self closing valve core, you can be sure to use it.
FAQ:
Q: How about payment terms?
A: 30% TT deposit + 70% TT before shipment
Q: How long is the fastest delivery time?
A: Within a week if we have stock parts.
Related Keywords