
Complex Precision and High Performance Injection Mould
- Payment Type:
- T/T
- Incoterm:
- FOB
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 42 Days
- Transportation:
- Ocean
- Port:
- Shenzhen
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 1000K shots |
Supply Ability: | 30 sets per month |
Payment Type: | T/T |
Incoterm: | FOB |
Certificate: | ISO 9001:2008 |
HS Code: | 8480719090 |
Transportation: | Ocean |
Port: | Shenzhen |
Plastic Injection Mold Design & Support
Industrial Design
Design for manufacturing services
Specification of plastic materials
Engineering and building of injection molds
Manufacturing of plastic injection molded components
Assembly, measurement and packaging.
If we can help you with your project please call us at +86 755 89490189 ext 8012
Project Information | ||
Product Description | Part Name | Plastic Injection Mould |
Part Material | PA | |
Part Size(mm) | 750*450*430 | |
Mould Description | Cavity Insert Material |
2312 HRC28-32 |
Core Insert Material |
2312 HRC28-32 |
|
Slider Insert Material |
|
|
Mould Cavities | 1+1+1+1 | |
Mold parts Standard | Hasco | |
Mould Life Time (Shots) | 400,000 | |
Mould Type | Formal mold | |
Runner Description | Cold runner | |
Injection Gate Type | Sub gate | |
Ejection System | thimble | |
Slide Qty. | 0 | |
Lifter Qty. | 0 | |
Injection moulding machine | 200T |
Complex Precision and High Performance Injection Mould 3K Mold is ISO-9001: 2008 certified. We use formal quality systems to manage the overall quality process and use precision measurement facilities by our well-trained team. All tooling and parts produced at our facility are constantly monitored by our Quality Assurance Department to meet your specifications.
Quality control Center:
3K team committed to meet customer quality and delivery request. The main quality control process as following:
Incoming quality control (IQC)
In process quality control (IPQC)
Quality assurance (QA)
Quality management flow:
1. Mold base inspection
2. Steel inspection
3. Mold component inspection
4. Electrodes inspection
5. Mold checking before assembly
6. (FAI, CPK) First Article dimension report
7. Mold checking before delivery
Related Keywords