
Car Door Handle Storage Box Injection Mould
- Payment Type:
- T/T
- Incoterm:
- FOB
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 49 Days
- Transportation:
- Ocean
- Port:
- Shenzhen
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 1000K shots |
Supply Ability: | 30 sets per month |
Payment Type: | T/T |
Incoterm: | FOB |
Certificate: | ISO 9001:2008 |
HS Code: | 8480719090 |
Transportation: | Ocean |
Port: | Shenzhen |
I'd like to give you a general idea of advantages that 3K mold have:
1)Delivery time,for general molds,most Chinese mold-maker will need 5-6 weeks for T1,we only need 25-30 days.
2)Price:our quality is in top level, as good as some big mold-making companies,?but price is just in middle level.
3)Service: all customer's inquiry will be replied within 24 hours.All RFQ will be available within 1-2 days,which helps our customers win more jobs from their customers.
4)Communication: We have business partner based in Germany, they can make the project management and after services for local and Europea market etc.
Project Information | ||
Product Description | Part Name | Automobile storage box tooling |
Part Material | PP+TV20 | |
Part Size(mm) | 78x65x25mm | |
Mould Description | Cavity Insert Material | 1.2343 HRC48-52 |
Core Insert Material | 1.2343 HRC48-52 | |
Slider Insert Material | 1.2343 HRC48-52 | |
Mould Cavities | 8 | |
Mold parts Standard | Hasco | |
Mold Size | 700x500x530mm | |
Mold weight | 1346 KG | |
Lead time | 7 weeks | |
Mould Life Time (Shots) | 1,000,000 | |
Mould Type | Export to Germany | |
Runner Description | Incoe Hot nozzle | |
Injection Gate Type | 4 hot nozzle to cold runner sub gate | |
Ejection System | Ejector pin | |
Cycle time | 35S | |
Slide Qty. | 16 | |
Lifter Qty. | 0 | |
Injection moulding machine | 300T |
3K Mold is ISO-9001: 2008 certified. We use formal quality systems to manage the overall quality process and use precision measurement facilities by our well-trained team. All tooling and parts produced at our facility are constantly monitored by our Quality Assurance Department to meet your specifications.
Quality control Center
3K team committed to meet customer quality and delivery request. The main quality control process as following:
Incoming quality control (IQC)
In process quality control (IPQC)
Quality assurance (QA)
Quality management flow:
1. Mold base inspection
2. Steel inspection
3. Mold component inspection
4. Electrodes inspection
5. Mold checking before assembly
6. (FAI, CPK) First Article dimension report
7. Mold checking before delivery
Related Keywords