
Air outlet grille injection moulding
- Payment Type:
- T/T
- Incoterm:
- FOB
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 60 Days
- Transportation:
- Ocean
- Port:
- Shenzhen
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 1000K shots |
Supply Ability: | 30 sets per month |
Payment Type: | T/T |
Incoterm: | FOB |
Certificate: | ISO 9001:2008 |
HS Code: | 8480719090 |
Transportation: | Ocean |
Port: | Shenzhen |
We are factory specializing in the manufacture and export of precision mold, precision spare part/components and precision plastic part for 15 years. We provide high quality products to our clients with our high level of professionals and powerful service team.
Our products are in Automotive, Household Appliance, Communications and Medical fields.
If you are any interesting to our company, please contact us at any time.
Project Information | ||
Product Description | Part Name | Air outlet grille injection moulding |
Part Material | PA+ABS | |
Part Size(mm) | 304*72*84 | |
Mould Description | Cavity Insert Material | 1.2343 HRC48-52 |
Core Insert Material | 1.2343 HRC48-52 | |
Slider Insert Material | 0 | |
Mould Cavities | 1 | |
Mold parts Standard | Hasco | |
Mould Life Time (Shots) | 1,000,000 | |
Mould Type | Export to France | |
Runner Description | Hot runner | |
Injection Gate Type | 2 points pin gate | |
Ejection System | Ejector Pin | |
Slide Qty. | 0 | |
Lifter Qty. | 0 | |
Injection moulding machine | 280T |
3K Mold is ISO-9001: 2008 certified. We use formal quality systems to manage the overall quality process and use precision measurement facilities by our well-trained team. All tooling and parts produced at our facility are constantly monitored by our Quality Assurance Department to meet your specifications.
Quality control Center
3K team committed to meet customer quality and delivery request. The main quality control process as following:
Incoming quality control (IQC)
In process quality control (IPQC)
Quality assurance (QA)
Quality management flow:
1. Mold base inspection
2. Steel inspection
3. Mold component inspection
4. Electrodes inspection
5. Mold checking before assembly
6. (FAI, CPK) First Article dimension report
7. Mold checking before delivery
Related Keywords