
Double-shot injection molding
- Payment Type:
- T/T
- Incoterm:
- FOB
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 60 Days
- Transportation:
- Ocean
- Port:
- Shenzhen
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 1000K shots |
Supply Ability: | 30 sets per month |
Payment Type: | T/T |
Incoterm: | FOB |
Certificate: | ISO 9001:2008 |
HS Code: | 8480719090 |
Transportation: | Ocean |
Port: | Shenzhen |
At 3K MOLD, our advantage is that we always consider your design with a view to efficient manufacturing. This helps to ensure reliable, smooth-running production in the longer term. The care we take at the design and product development stage ultimately helps to cut out downtime and unnecessary design improvements. This then increases the lifespan of the tool, which save thousands of pounds.
In addtion, as an established Chinese company, we guarantee confidentiality for your invention, backed up by your local law. This removes the breach of copyright risk associated with foreign tool making in recent years.Unlike some moulding shop tool makers, all our design and tool making is carried out in-house. We do not outsource or subcontract out any work, providing an extra level of security that your idea will remain entirely confidential.
3K is your trustworthy Mould Suppliers!!!
Project Information: | ||
Product Description | Part Name | Auto spare parts |
Part Material | PA | |
Part Size(mm) | 280*199*24 | |
Mould Description | Cavity Insert Material | 2312 HRC28-32 |
Core Insert Material | 2312 HRC28-32 | |
Slider Insert Material | S50C | |
Mould Cavities | 1+1 | |
Mold parts Standard | Hasco | |
Mould Life Time (Shots) | 100,000 | |
Mould Type | Export to France | |
Runner Description | Cold runner | |
Injection Gate Type | Sub gate | |
Ejection System | Ejector Pin | |
Slide Qty. | 0 | |
Lifter Qty. | 0 | |
Injection moulding machine | 200T |
3K Mold is ISO-9001: 2008 certified. We use formal quality systems to manage the overall quality process and use precision measurement facilities by our well-trained team. All tooling and parts produced at our facility are constantly monitored by our Quality Assurance Department to meet your specifications.
Quality control Center
3K team committed to meet customer quality and delivery request. The main quality control process as following:
Incoming quality control (IQC)
In process quality control (IPQC)
Quality assurance (QA)
Quality management flow:
1. Mold base inspection
2. Steel inspection
3. Mold component inspection
4. Electrodes inspection
5. Mold checking before assembly
6. (FAI, CPK) First Article dimension report
7. Mold checking before delivery
Related Keywords