
CNC Lathe Turning Service
- Payment Type:
- T/T
- Incoterm:
- FOB
- Min. Order:
- 1 Piece/Pieces
- Min. Order:
- 1 Piece/Pieces
- Delivery Time:
- 3 Days
- Transportation:
- Air
- Port:
- Shenzhen, Hongkong, Guangzhou
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Made in China |
---|---|
Payment Type: | T/T |
Incoterm: | FOB |
Certificate: | ISO 9001 |
HS Code: | 84807190 |
Transportation: | Air |
Port: | Shenzhen,Hongkong,Guangzhou |
CNC Lathe Turning Service
Our company was founded in 2009 is an Engineering, Manufacturing and Global Project Management company in the field of plastic injection and molding components, machining parts.
We are situated in the town of Shajing Town, Shenzhen city, the cradle of mouldmaking industry in China and is today one of its main centers.
We have accumulated an invaluable experience and know-how with the engineering and manufacturing of about 2000 projects and thus offer you the best technical solution for your projects.
Besides the conventional moulds, we have a good experience in CNC Milling And Turning.
So, if you are looking for a good price and service without sacrificing quality, please contact us as we are at your disposal for further information.
We look forward to your contact soon.
Description:
- Process tolerance: +/-0.01mm
- Manufacturing Lead time: 3 days
- Delivery lead time: 3 days
- Size: D40X100mm
- Material: 1.2312
- Hardness: Untempered
- ISO 9001 certified
- CNC Milling And Turning For Injection Mould Components
- HS code: 84807190
Advantage:
- Show your customers and investors a model of your product
- Demonstrate the appearance, dimensions and features of your product
- Test your design for its suitability
- Save time and money by identifying and reducing design flaws
- Improve and streamline the production process
- Reduce your work load when the time comes to manufacture
- Create multiple versions with different colors, surface textures and finishing processes
Why choose us?
- Mature technology with precision equipment we use. Our parts will prefectly suit your needs, can be assembled immediately without fitting.
- High quality insurance. All parts be fully inspected in each stage of process. Inspection report will be provide with everything correct and acccurate.
- Fastest deliver time, as soon as 15 days tooling time +3 days deliver time for whole set of mold parts.
Company Image:
At HZ, we use Hi-speed CNC machine center, Sodick slow-feeding-wire-cut, Sodick mirror EDM and CMM machine checking every process to provide accuracy and precision when making your CNC Machining parts & Mold Components. Our professional and aspiring team of engineers and technicians work in a clean and tidy environment use the advanced equipment, to turn your concepts into reality quickly, accurately and at a great price. You design it and we will make it.
Office and Design Department
High-speed CNC machine
Precision EDM and Wire-EDM
Inspection Department
Related Keywords