
Villa sunshine room
-
USD150≥100 Square Meter
- Payment Type:
- L/C, T/T, Western Union
- Incoterm:
- FOB, CFR, CIF, EXW
- Min. Order:
- 100 Square Meter
- Min. Order:
- 100 Square Meter
- Delivery Time:
- 20 Days
- Transportation:
- Ocean, Land
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Shenzhen,China |
---|---|
Productivity: | 50000 |
Supply Ability: | 5000 Square.meters/month |
Payment Type: | L/C,T/T,Western Union |
Incoterm: | FOB,CFR,CIF,EXW |
Certificate: | ISO9001:2008 |
Transportation: | Ocean,Land |
The size of main track profile is 120×120×3.0 mm that can be made large span sun room.It's a sunroom system without any exposed rivets.Special conversion design, radian adjust freely, without any gap, convenient installation. Super waterproof, has the glass caps, equipped with insulation rubber. It can use double glass or laminated glass. Post separatewaterproof board.
2 Frame :
6063-T5 Aluminum alloy
The mean value of reliability analysis of aluminum alloy structural members are over 3.7
The surface of aluminum alloy is powder coated with colors like white, black, creamy, gray, green
3 Rail:
The ground rails are made from tabular aluminum sections, so there are no sharp exposed edges. Ground rails can be attached to even surfaces, horizontally or vertically on the walls of buildings.
The number of tracks on the ground rails corresponds to the number of segments making up the swimming pool enclosure.
4 Hardware & Fasteners
We use stainless steel and aluminum hardware and fasteners throughout the entire enclosure.
5 To seal the upper space between the adjacent segments we use EPDM material.
6 Anti-dust flap installed on the bottom edge of the gable ends to prevent dust and leaves coming into the building from this part.
Warranty:
East Standard Prefab House will have at least 10 years life expectancy under normal use and climate conditions.
The manufacturer of Polycarbonate provide a 10-year limited warranty on 3mm compact
The manufacturer of Aluminum profiles provide a 10-year limited warranty on all Aluminum parts ;
Installation
For transportation reason, the green house get to our customer in pieces, it needs to be assembled by customer.if it is small in size, we recommend you can install by yourself. If It is huge in size, you may need an engineer to help. We provide customized installing instruction for each of our product.
Packing information |
Packaging Detail: |
Step1.Protective tape protects frames from scratches; Step 2.Keep windows or doors fixed on iron pallets; Step 3.Tie up windows or doors on the iron pallets with plastic belts; Step 4.PE films to keep away from sea water; Step 5.Fill in the space between each two iron pallets by air bags; Step 6.Tie up iron pallets in container with plastic belts. Our packages will ensure the windows and doors arrive at project jobsite in good conditions |
Delivery Time: | 15-25 working days on your confirmation |
Related Keywords