
2017 Sliding bath shower door
- Payment Type:
- L/C, T/T, D/P, Money Gram, Western Union
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 100 Square Meter
- Min. Order:
- 100 Square Meter
- Delivery Time:
- 30 Days
- Transportation:
- Ocean, Land, Air
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | China |
---|---|
Productivity: | 5000 SQ.M/Month |
Supply Ability: | 5000 SQ.M/Month |
Payment Type: | L/C,T/T,D/P,Money Gram,Western Union |
Incoterm: | FOB,CFR,CIF |
Certificate: | ISO9001:2008 |
Transportation: | Ocean,Land,Air |
Product Description
Product Description
Door's size depends on the client's door actual opening
Single glass panel thickness: Normally suggest 8mm, 10mm or 12mm.
Application: Bathroom, Shower room, Bed room, House, office building room, house room, hotel and etc
Products Features:
1. Its performance of anti-impact, anti-bending and anti-temperature, all around 3-5 times than ordinary glass.
2. Safety, Tempered glass is hard to break, even broken, it will become lots of mini pieces, will not cause bad hurt to peoble.
3. Tempered glass also have excellent stability under large difference in temperature(within 300° C)
We also can do heat soaked treatment on the glass if the clients have requirement.
Accessories:
1. Stainless steel rails (SUS304, SUS316) suit for the sliding door.
2. SUS304, SUS316(handles, hinges, rods, sliding rails, floor spring, spider and etc)
3. About Handles, we also have many different types for your reference.


Packaging information of Sliding Glass Door |
Packaging Detail: |
Step1.Protective tape protects frames from scratches; Step 2.Keep windows or doors fixed on iron pallets; Step 3.Tie up windows or doors on the iron pallets with plastic belts; Step 4.PE films to keep away from sea water; Step 5.Fill in the space between each two iron pallets by air bags; Step 6.Tie up iron pallets in container with plastic belts. Our packages will ensure the windows and doors arrive at project jobsite in good conditions |
Delivery Time: | 15-25 working days on your confirmation for shower door |
Related Keywords
Related Keywords