Shenzhen Grosun Technology Co., Ltd.
Shenzhen Grosun Technology Co., Ltd.
OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
  • OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
  • OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
  • OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
  • OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
  • OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
  • OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor
OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor

OEM Factory 15W Laptop Adapter AC to DC Power Supply 220V to 12V 1.25A Adaptor

Delivery Time:
10 Days
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Guangdong, China (Mainland)
Product Description
Product Description
Product Description OEM Factory 15W Laptop Adapter AC to DC 
Power Supply 220V to 12V 1.25A Adaptor
Product Name
Wholesale Desktop AC DC Adapter 5V 3A Laptop Power Adapter with CE UL FCC GS certificate
Input Voltage
110-240Vac
Voltage Range
90-264Vac
Input Frequency
47-63Hz
Input Current
0.5A max. @ 100Vac, 0.3A max.@220Vac
Inrush Currtent
50A max.@220Vac
Output Voltage
12V
Output Current
1.25A
Max.Output Power

15W
Efficiency
82%
Hold Time
10ms
Products Show Our Company Packing & Delivery FAQ Q: Are you trading company or manufacturer ? A: We are factory.
Q: How long is your delivery time? A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ? A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ? A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
OEM Service Contact Us Shenzhen Grosun Technology Co., ltd. Address: 3/F, Block C Xi Rong Industrial Zone, Fu Rong Rd No.11, Xi Xiang Town, Bao’an District, Shenzhen P.O 518000
Tel: +86-755-29643287
Fax: +86-755-23211811

Send your message to this supplier

  • Mr. Andy Wang

  • Enter between 20 to 4,000 characters.