
100-277VAC 100W LM80 DLC china supplier wholesale led high bay light
- Delivery Time:
- 5 Days
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | Guangdong, China (Mainland) |
---|
Product Description
Product Description
Product Description 100-277VAC 100W LM80 DLC china supplier wholesale led high bay light
Benefits
1.MH/HPS/HID/MHL/CFL lamp retrofit
2.Screw Base Direct Install by bypass ballast
3.100% Pure Aluminum Fins Heat Sink
4.Universal Base E26/E27/E39/E40
5.ETL CETL DLC CE ROHS listed
Features
1. Beam angle:120 degrees.
2. Aluminum fins heat sinks is good for heat dissipation.
3. It's major to replace the CFL/MH/HID/HPS.
4. Green, energy saving, long and reliable life of 50,000 hours.
5. No RF interference, No IR/UV radiation ,no mercury pollution.
6. Wide colour availability in degrees Kelvin(K),2700-6700K.
7. Streamline exterior design, beautiful appearance.
8. Environment friendly ,energy saving (70~80%).
9. Special circuit design, each LED work separately,
avoiding the single broken LED influence problem

Application
1. Area Lighting/Street Lighting.
2. Garage Lighting/Ceiling Lighting.
3. Warehouse Lighting.
4. High/Low Bay Lighting
LUMINOUS INTENSITY DISTRIBUTION
INSTALLATION
Normally. The traditional lamp has the ballast or capacitor or ignitor, like HPS,MH

Packaging & Shipping
Company Information
Our Services 1.Any question of our products will be replied in 24 hours.
2.Prompt delivery
3.OEM & ODM accepted
4.Every month new design and mass produce ability will make you a very good advantage in your market FAQ 1. How long does it take for my order to be shipped? And how long can I receive it.
Generally, your order will be shipped within 7-15 working days after your payment verified by Aliexpress. But in cas e of any hot products without raw material, it will need 15-20 days.
2. How about the after sale service?
Customers” satisfaction is always our No. 1 priority. If you have any problem or doubt about our product or policy, welcome to contact us by email or phone. We’ll resp ond you within 24 working hours. 3.What's else products you sell?



1.MH/HPS/HID/MHL/CFL lamp retrofit
2.Screw Base Direct Install by bypass ballast
3.100% Pure Aluminum Fins Heat Sink
4.Universal Base E26/E27/E39/E40
5.ETL CETL DLC CE ROHS listed
Features
1. Beam angle:120 degrees.
2. Aluminum fins heat sinks is good for heat dissipation.
3. It's major to replace the CFL/MH/HID/HPS.
4. Green, energy saving, long and reliable life of 50,000 hours.
5. No RF interference, No IR/UV radiation ,no mercury pollution.
6. Wide colour availability in degrees Kelvin(K),2700-6700K.
7. Streamline exterior design, beautiful appearance.
8. Environment friendly ,energy saving (70~80%).
9. Special circuit design, each LED work separately,
avoiding the single broken LED influence problem



1. Area Lighting/Street Lighting.
2. Garage Lighting/Ceiling Lighting.
3. Warehouse Lighting.
4. High/Low Bay Lighting


Normally. The traditional lamp has the ballast or capacitor or ignitor, like HPS,MH





2.Prompt delivery
3.OEM & ODM accepted
4.Every month new design and mass produce ability will make you a very good advantage in your market FAQ 1. How long does it take for my order to be shipped? And how long can I receive it.
Generally, your order will be shipped within 7-15 working days after your payment verified by Aliexpress. But in cas e of any hot products without raw material, it will need 15-20 days.
2. How about the after sale service?
Customers” satisfaction is always our No. 1 priority. If you have any problem or doubt about our product or policy, welcome to contact us by email or phone. We’ll resp ond you within 24 working hours. 3.What's else products you sell?

Related Keywords
Related Keywords
You May Also Like
You May Also Like