Shenzhen Uni-shine Optoelectronic Co., Ltd.
Shenzhen Uni-shine Optoelectronic Co., Ltd.
9W Clear Cover No Need to Remove Electronic Ballast T8 LED Tube Light
  • 9W Clear Cover No Need to Remove Electronic Ballast T8 LED Tube Light
9W Clear Cover No Need to Remove Electronic Ballast T8 LED Tube Light

9W Clear Cover No Need to Remove Electronic Ballast T8 LED Tube Light

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description
  • Product Details

Basic Specification

Dimension D26x600mm
Housing material alumimum+PC
Luminous flux 750lm
Beam angle 140degree
LED type SMD 3014
Power 9W
Life 40,000hours above
Package Yes
Tube Diameter T8
Color Tones Warm Color
Lamp Base G13
Length 60cm
Illuminant SMD
Voltage 220V

Detail Description

9W clear cover no need to remove electronic ballast t8 led tube light

Outstanding features
1. Same easy as replacement with a new fluorescent tube thanks to compatible with most kinds or brands of ballasts. For inductive ballast, you don\'t even have to remove the starter.

2. Energy saving: compared with common LED tube, it may increase 0.5~2W because of ballast, but it saves a lot of complicated replace work and trouble, you don\'t have to pay an electrician for replacement.

3. If a LED tube fails to work, you can easily install back a fluorescent tube, because the ballast is still there.

4. In case the ballast fails to work, just remove the ballast, you don\'t have to replace with a new ballast.

Electrical optical characteristic
Product name 9W clear cover no need to remove electronic ballast t8 led tube light
Model No. HCL-T806P09TC-B5WJ
Housing material aluminum+PC
Power consumed 9W
Power factor ≥0.90
Luminous flux 750LM
Beam angle 140°
Size 26x600mm
Input voltage 85~265V/AC
Color temperature 2700-3500K
Color warm white
Color rendering index ≥80Ra
Certificates CE, RoHS, Fcc
Private logo available
Packaging 1pc/polybag/white mail order box
Q\'ty/CTN 50pcs
CTN size 1280x220x220mm
Loading port Shenzhen
 
Applications
1. hotel
2. Factory & Office
3. Store and shopping mall
4. Residential complex
5. School, College, University, institute
6. Hospital
7. Places where need energy saving, environment friendly lighting.

Trade terms
1. Payment: L/C, T/T or western union.

2. Lead time: 1~3working days for samples, bulk order depends
3. LED tube sample can be delivered in 5-7 working days
4. Shipping freight are quoted under your requests
5. Shipping port: Shenzhen, Mainland China
6. Discounts are offered based on order quantities
7. MOQ:10pcs


Ours services

1. Your inquiry related to our products or prices will be replied in 24hrs
2. Well-trained and experienced staffs to answer all your enquires in fluent English
3. OEM&ODM, any your customized lightings we can help you to design and put into product
4. Distributorship are offered for your unique design and some our current models
5. Protection of your sales area, ideas of design and all your private information

 

Application scene

 
Factory view
 
Production view
 
 
ISO standard certificate

 

 

Additional Information

Payment Terms L/C, T/T, Others
Minimum Order 50pcs
Lead Time / Delivery Time 7 Day(s)
Sample Available YES
Delivery Details samples: 1~3 working days, bulk order:7~15 working days
FOB Port Shenzhen
Loading Info samples and small order: Express preferred, bulk order: air freight or sea freight
Packing Info 1pc/PE bag/inner white box, 50pcs/carton, size of inner white box: 37x37x615mm, size of carton: 210x210x1285mm, G.W. of carton: 12.7kg
Target Market(s) North America, Hong Kong/ Macao/ Taiwan, Japan & Korea, Western & Southern Europe, Northern Europe

Send your message to this supplier

  • Mr. Jack

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords