
Alloy / Aluminum Die Casting Solar Equipment Parts with Clear Anodizing
- Payment Type:
- L/C, T/T, Paypal, Money Gram, Western Union, escro
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | Shenzhen |
---|---|
Payment Type: | L/C, T/T, Paypal, Money Gram, Western Union, escro |
Product Description
Product Description
Alloy / Aluminum Die Casting Solar Equipment Parts with Clear Anodizing
Quick Details:
Material: Aluminum / alloy
Process: Die casting
Surface Treatment: Anodizing
Delivery time: 7-30days
MOQ: 1 PCS
Business Flow:
Clients' sample or 2D/3D drawings→Our engineering department→Clients' requirements and details→Sample production→Clients receive samples→ Clients checked and approved→Mass production→Delivery products
Currently Market:
USA, Argentina, Canada, Australia, New Zealand, UK, France, HK, Singapore, Malaysia and so on...Nowadays, full-service manufacturer and partner serving companies, like Microsoft, Dell, Mitsubishi, 3M, Han's Laser, Trade Union Group, Mindray Medical.
Competitive Advantages:
1, High Precision: ± 0.005mm Tolerance; Surface Roughness: Ra 0.4-1.6μ M;
2, Very low MOQ: No quantity limited, 1 piece is also accept, while mass production will cheaper;
3, Prompt Lead Time: Sample just need 7-10 days, mass production need 30-40 days; Near shenzhen port and HK port, very convenient transportation;
4, Free Packaging: Plastic film, carton & wooden box, all various size of packaging materials according to client's specific requirements will be totally free for you;
5, ISO, SGS, RoHS certified reports about raw material and finished products, inspection reports, measuring document can be offered to you;
6, Payment Terms: T/T, 30% down payment paid first, remaining balances paid after we offer bill of lading scanning files; If you have other comments, we can discuss later;
7, Delivery Ways: 0.5-45kg, advice use DHL/TNT/UPS/FEDEX; 45-100kg, advice use air freight; >100kg, advice use sea freight, according to client's requirements;
8, Non-standard / standard / OEM / ODM / customized service provided; STEP, DWG, PDF, IGS, PRT, DRW, DXF, SLDPRT, SLDDRW drawing format are both OK;
FAQ:
(1). Question---Are you the trading company or factory?
Answer-----We have our own factory and own advanced machine equipment.
(2). Question---Where is your factory located? How can I visit there?
Answer-----Our factory is located in Shenzhen city, China. You can fly to Shenzhen airport; Clients from home or abroad are warmly welcome to visit our factory!
(3). Question---What`s the production capacity for your company?
Answer---Normally can reach 1000, 000 pieces per month.
(4). Question---How can I get some samples?
Answer---We are happy to offer you free samples if you have actual mass production plan.
(5). Question---How does your factory do regarding quality control?
Answer---Our factory has passed ISO/SGS 9001 quality certification. ISO, SGS Rohs certified reports of raw material and finished products can offer to you.
(6). Question---How about the delivery time?
Answer---The delivery time will according to the part quantity, usually sample will need 7-10 days, and part production will need 30-40 days!
(7). Question---What`s the Scrap rate for the part?
Answer---Normally, the scrap rate is 3%~4%. However, we won't send you any scrap part, all the part will be 100% inspected by our quality department to make sure no available ones.
How to contact us?
Send your inquiry detail in the below for free sample, click "Contact Now"!
Quick Details:
Material: Aluminum / alloy
Process: Die casting
Surface Treatment: Anodizing
Delivery time: 7-30days
MOQ: 1 PCS
Business Flow:
Clients' sample or 2D/3D drawings→Our engineering department→Clients' requirements and details→Sample production→Clients receive samples→ Clients checked and approved→Mass production→Delivery products
Currently Market:
USA, Argentina, Canada, Australia, New Zealand, UK, France, HK, Singapore, Malaysia and so on...Nowadays, full-service manufacturer and partner serving companies, like Microsoft, Dell, Mitsubishi, 3M, Han's Laser, Trade Union Group, Mindray Medical.
Competitive Advantages:
1, High Precision: ± 0.005mm Tolerance; Surface Roughness: Ra 0.4-1.6μ M;
2, Very low MOQ: No quantity limited, 1 piece is also accept, while mass production will cheaper;
3, Prompt Lead Time: Sample just need 7-10 days, mass production need 30-40 days; Near shenzhen port and HK port, very convenient transportation;
4, Free Packaging: Plastic film, carton & wooden box, all various size of packaging materials according to client's specific requirements will be totally free for you;
5, ISO, SGS, RoHS certified reports about raw material and finished products, inspection reports, measuring document can be offered to you;
6, Payment Terms: T/T, 30% down payment paid first, remaining balances paid after we offer bill of lading scanning files; If you have other comments, we can discuss later;
7, Delivery Ways: 0.5-45kg, advice use DHL/TNT/UPS/FEDEX; 45-100kg, advice use air freight; >100kg, advice use sea freight, according to client's requirements;
8, Non-standard / standard / OEM / ODM / customized service provided; STEP, DWG, PDF, IGS, PRT, DRW, DXF, SLDPRT, SLDDRW drawing format are both OK;
FAQ:
(1). Question---Are you the trading company or factory?
Answer-----We have our own factory and own advanced machine equipment.
(2). Question---Where is your factory located? How can I visit there?
Answer-----Our factory is located in Shenzhen city, China. You can fly to Shenzhen airport; Clients from home or abroad are warmly welcome to visit our factory!
(3). Question---What`s the production capacity for your company?
Answer---Normally can reach 1000, 000 pieces per month.
(4). Question---How can I get some samples?
Answer---We are happy to offer you free samples if you have actual mass production plan.
(5). Question---How does your factory do regarding quality control?
Answer---Our factory has passed ISO/SGS 9001 quality certification. ISO, SGS Rohs certified reports of raw material and finished products can offer to you.
(6). Question---How about the delivery time?
Answer---The delivery time will according to the part quantity, usually sample will need 7-10 days, and part production will need 30-40 days!
(7). Question---What`s the Scrap rate for the part?
Answer---Normally, the scrap rate is 3%~4%. However, we won't send you any scrap part, all the part will be 100% inspected by our quality department to make sure no available ones.
How to contact us?
Send your inquiry detail in the below for free sample, click "Contact Now"!
Related Keywords
Related Keywords