SDR Mold Technology Co., Ltd.
SDR Mold Technology Co., Ltd.
Plastic First-Aid Kits Injection Mold
  • Plastic First-Aid Kits Injection Mold
Plastic First-Aid Kits Injection Mold

Plastic First-Aid Kits Injection Mold

Payment Type:
T/T
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Payment Type: T/T
Product Description
Product Description
Plastic First-aid Kits injection mold
About us:
160 workers, 4000 workshop, 8 years experience, closely and long term
Cooperation with clients from all over the world, OEM service available, this
Is how we keep good quality and reliable cooperation for global valued customers.
Our business scope:
1. Plastic mold design & fabrication
2. Injection moulding
3. Secondary operation
Process:
1. Quote competitive price according to customer's detailed requirement.
2. Sign agreement.
3. Customer T/T deposit to us to start to design mould.
4. Send mould drawing to customer for confirmation.
5. Mould design confirmed and start to make mould.
6. Make mould trial during tooling time ( Which we get agreement with customer).
7. Send mould trial sample to customer for inspection. Or customer come to our factory to inspect mould personally.
8. Customer T/T balance to us after mould confirmed.
9. Deliver mould after get balance.
We offer the following service:
1. Design and engineering
2. Tooling
3. Injection molding
4. Die casting
5. Prototyping
Our product range:
1. Automobile mould & parts
2. Medical appliance& parts
3. Household appliance& parts
4. Consumer electronic& parts
5. Plastic gears
6. Office appliance
7. Industry goods etc.
Our advantages:
1. OEM
2. High quality
3. Reasonable price
4. On time delivery
5. Good after sale service
6. Strict quality control

Our management flow
1. RFQ
Please provide following data when requesting for quotation and our quotation team will offer areasonable quotation within 3 days.
Data required: 2D(dwg/dxf/pdf) & 3D (stp/igs/x_t) part drawing, requirement on cavity number, plastic, mould life, surface finish. Please tell us an appointed steel material. Otherwise, we will choose a suitable type based on your requirement on mould life.
2. For RFQ
Our technical engineer team can support technical analysis, includes Product issue, mould design.
3. Order
When you are satisfied with our quotation and facility, we can sign contract for cooperation. You can either send PO via email or fax.
4. Project
Management a professional project engineer will be assigned to follow up the project with you, upon the receipt of PO from you. Detailed project managing procedure as follows:
(1) Firstly aseries of engineering analysis will be carried out to your part drawing, including part & mould structure analysis and Mold flow analysis etc. Through analysis we can discover the disfigurement on part design, and propose on improvement, or send modified drawing for your confirmation.
(2) We can take mold flow analysis upon your request.
(3) Then we will start 2Dmould layout design. Normally it takes 3~7 days to complete, and we will have one day to have an inner design checking and improving before sending the mould layout to you.
(4) We will modify the mould layout after receiving your comments, till your approval on the final design.
(5) We will start ordering steel and mould base, and start full 3D mould design upon your confirmation letter on our mould design.
(6) Normally it takes 3~7days to complete the 3D mould design. If you need to review, we can send the 3Dfile to you after design finished.

Send your message to this supplier

  • Ms. Solinda

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords