Telong Energy Technology Co., Ltd.
Telong Energy Technology Co., Ltd.
2V3000ah Maintenance-Free Lead Acid Battery for Solar Power System, Telecom Power Station
  • 2V3000ah Maintenance-Free Lead Acid Battery for Solar Power System, Telecom Power Station
2V3000ah Maintenance-Free Lead Acid Battery for Solar Power System, Telecom Power Station

2V3000ah Maintenance-Free Lead Acid Battery for Solar Power System, Telecom Power Station

Payment Type:
L/C, T/T, Western Union
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Shenzhen, China (Mainland)
Payment Type: L/C, T/T, Western Union
Product Description
Product Description
2V3000AH Sealed Lead Acid Battery, Solar Battery, UPS Battery, Maintance-Free Telecom Power Station Battery

1. Feature

- Good cycle property, enhanced overcharge endurance and over discharge recovery property.
- High purity raw material: ensure low self discharge rate.
- Using oxygen recombination technology: maintenance-free
- Low acid density, excess of electrolyte and larger distance between plates to keep battery at low temperature and slow down plate grid corrosion speed
- High qualified AGM separator and battery management system ensure battery with a longer cycle life.
- Special vent valve design: control water losing, prevent air and spark going inside.
 
2. Application
- Green energy systems(solar, wind, etc)
- Solar power station, signal station & measurement stations
- Telecommunications systems
- Street signs, railway crossing, emergency lighting & traffic lights
- Medical equipment & electric tools
- Alarm installations, bank system & marine system

3. Advantage
Choose Telong, and you will choose a good partner! You will benefit from:
- Lowest purchasing cost with no quality worry
- Premium quality with real no problem batteries
- Standard but perfect individual printing and packing
- Maximize your profit by ordering directly with us, the terminal manufacturer
- Professional OEM is available for your esteemed company
 
4. Quality Assurance

- Equipment control
We adopt the entire computer automatic control (Density testing, adding acid, charging, etc.)
 
- Raw material control
Any raw material will be forbidden used in the production if they didn't pass the testing by laboratory strictly.
 
- Production process control
The semi-finished products must pass several inspections in the production line.
 
- Finished products control
Before packaging, the finished battery must be tested 100% by our function testing machine and pass the inner resistance testing, density testing, 3-5
ºC discharge performance testing etc.
 
- Shipment control
The goods can't be sold unless their appearance and performance are tested 100% by the professional inspector.

5. Installation & maintenance
 
Before Installation
- The battery has been charged in factory, don't short-circuit the terminals
- Please handle with well-distributed strength and keep the terminals or taps away from any kind of damage.
- Keep the batteries in a cool, dry, ventilated and clean place. Please charge to full capacity before stock.
- Please detach the connectors when batteries are stocked on shelf.
- The battery will lose some capacity due to self-discharge during storage or transport, please recharge the battery before use. The battery has to be charged every 3 or 6 month for the longest. Basically the batteries should be recharged with constant voltage (2.25v/cell@25ºC) and limited current (0.10CA). The charging time is variable to the residual capacity.
 
During Installation
- Batteries should be put in a dry and ventilated place, keep away from direct sunlight and any kind of heating.
- Use insulated tools when installing the battery so as to avoid shock accidents.
- Fasten all bolts tightly when installing connecting wire to illuminate occurrence of sparks.
- It is recommended that battery be connected in series with the same type that has equivalent amount of capacity.
- Keep a minimum distance of 2cm between batteries, otherwise the wires may be overheated by any chance.
- Only batteries or battery band that have the same nominal voltage and capacity can be connected in parallel (Parallel is not favorable advised).

2V3000ah Maintenance-Free Lead Acid Battery for Solar Power System, Telecom Power Station2V3000ah Maintenance-Free Lead Acid Battery for Solar Power System, Telecom Power Station

Website:
http://www.sztlg.com/
http://www.telongbattery.com/
http://tlgbattery.en.made-in-china.com/

Send your message to this supplier

  • Mr. Jack He

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords