
High Performance LED emergency light ceiling mounted
Your message must be between 20 to 2000 characters
Contact NowBasic Specification
Material | ABS body + PC cover |
---|---|
Battery | 6V/3.8Ah rechargeable lead-acid battery |
Switch mode | Off/ bright/ super bright |
Brightness | Super bright 300LM; Normal bright 60LM |
Operation | super bright 7hrs, bright 18hrs |
Battery Type | Lead Acid |
Voltage | 6V |
Application | Airport, Bathroom, Bathroom Room, Bedroom, Car Park, Church, Cinema, Gallery, Garage, Hospital, Hotel, Kitchen, Meeting Room, Museum, Office, Restaurant, Shopping Mall, Sitting Room |
Battery Capacity | 4.5AH |
Light Source | LED Lamp |
Detail Description
Upek\'s difference
Housing: ABS
Transparent cover: Unbreakable PC cover
Reflector: 3D reflector
Lighting Source: 16pcs highest 5050 led
Luminous flux: Super bright 300lumens, 7 hours with effective efficiency
Bright 60 lumens, 18 hours with effective efficiency
Battery 6V/3.8Ah rechargeable lead-acid (90-285V) storage battery
Fully recharged time 12 hours (90-285V)
Power Supply: AC-DC adaptor (build-in)
Protection Overcharge and deep discharge protection
Charging Indicator Charging: red
Fully recharged: green
Switch mode: Off, Bright, Super bright
Color: Red, Black, yellow, blue, white
Main Features
More than 20hrs working time
New reflection makes more brightness
Strong fireproof ABS body+unbreakable front PC cover
Anti-thunder and moisture-proof
Superior electronics, PCB with 100% aging process
Function: emergency led light
Specifications
Housing Material |
Fireproof ABS+ transparent PC cover |
Power Supply |
AC-DC adaptor (built-in) |
Lighting Source |
16pcs 5050 SMD |
Switch Mode |
Off/ Bright/ Super bright |
Operating Time |
Super bright: 7hrs; Bright: >20hrs |
Brightness |
Super bright 300 lm; Bright 60 lm |
Battery |
6V/3.8 Ah rechargeable lead-acid storage battery |
Fully Recharged Time |
10 hrs |
Protection |
Overcharge and deep discharge protection |
Function/Description |
emergency lighting |
Pictures
Application
Leading Manufacturer for Rechargeable Battery Application Product
ISO9001 certified factory
More than 200 base products to enter
10 years\' excellent OEM/ODM service experience
Joint venture new project / new market development
Creative design leading the market
Exclusive mold, reset spec., cost evaluation, R&D, production, QC, presentation, shipping
Packing & Shipping
Packing |
color giftbox with polyfoam and bubble bag |
Inner packing |
1pc / giftbox |
Outer packing |
12pcs / carton |
Carton size |
635*380*365mm |
G.W. |
20kg |
Qty / container |
3888pcs / 20\'FT 9360pcs/40\'HQ |
Export commodities are usually go by sea, the cutting port is shenzhen,
will take 20 to 40 days according to different destination port.
Company Information
Q: What\'s the difference between Upek\'s emergency light and the others\'?
A: Upek has excellent supply chain management and quality control to ensure the highest performance VS price.
Q: How can I have my own brand products?
A: We offer professional OEM/ODM service.You can choose from the base product, or pay for the mold to make exclusive design with unique body, color, led, battery and function.
Q: What\'s the difference between Chinese lead-acid battery and Panasonic\'s?
A: For the same 6V/4.5Ah lead-aid battery, China domestic battery is around 200 cycles,while Panasonic\'s is 400 cycles.
Q: May I have a better battery?
A: Yes, Upek is working on new tech LiFePO4 battery, which can charge and discharge for more than 4000 cycles, and support quick charge.
Q: Can I add the remote control function?
A: Yes, we have one ready model with remote controller, also ODM a new project is acceptable.
Q: May I have a free sample?
A: Sample can show the sincerity of business. The sample fee will adjust to your payment for bulk order.
Additional Information
Payment Terms | L/C, T/T, Western Union |
---|---|
Minimum Order | 2000 |
Lead Time / Delivery Time | 30 Day(s) |
Sample Available | YES |
Delivery Details | 30 DAYS AFTER ARTWORK CONFIRMED |
FOB Port | Shekou |
Loading Info | Export commodities are usually go by sea, the cutting port is shenzhen, will take 20 to 40 days according to different destination port. |
Packing Info | Giftbox: 182*102*345mmQty/Ctn:12pcs/Ctn N.W: 18.6Kg/CtnG.W: 20.0Kg/CtnMeas: 635*380*365mm1*20GP: 3888pcs 1*40HQ: 9360pcs |
Target Market(s) | North America, Southeast Asia, Eastern Europe, Africa(except Middle East), Middle East & South Asia, Central & Southern Asia, Middle East |
Related Keywords