Shenzhen Powerteam Lighting Technology Co., Ltd.
Shenzhen Powerteam Lighting Technology Co., Ltd.
Energy Saving LED 200W High Bay Light,HOT SELL IN 2013
  • Energy Saving LED 200W High Bay Light,HOT SELL IN 2013
Energy Saving LED 200W High Bay Light,HOT SELL IN 2013

Energy Saving LED 200W High Bay Light,HOT SELL IN 2013

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description
  • Product Details

Basic Specification

LED type: USA bridgelux LED
Warranty : 3 years
Light Source: LED
Material Aluminum Die Casting
Light Source LED
IP IP65
Voltage 90-260V

Detail Description

                Energy Saving LED 200W High Bay Light,HOT SELL IN 2013
 
Item No                         CY-HB-A-200W
Input Voltage AC100-240V
Color Tempreature 3000-3200k,4000-4300k,6000-6500k
Power 200W
Power Factor >0.95
LED Chips Brand Taiwan Epistar 45Mil or Bridgelux chips
LED Efficiency 100lm/w
Lifespan 50000hours
Ip Rate IP65 Waterproof
Shell degree 45degree 90degree 120degree
Driver brand UL Meanwell Driver,or constant driver
Warranty 3 Years
Short delivery samples 3-5days,bulk 5-7days
Heatsink Size D240mm*H225mm
Package Standard carton package

1.Sample required
>>Sample required: Sample is available, but customer must pay for the sample price and shipping costs.
>>Sample delivery time: About 3-5 days for standard model and 8-9 days for OEM production or customer\'s designs.
2. Period of delivery
>>Less than 500 pcs: 5-7working days.
>>Between 500 pcs and 1000 pcs: 10-15 working days.
>>More than 1000 pcs: around 25 working days.
3.Terms of payment
After an order, please pay 30% deposit, balance before shipment cleared
 
Features;
Punching multi-surface three-dimension radiator. Effectively fasten air-flow through the radiator.
Pioneering Cu-Mg-Al alloy material, excellent heat conduction rate.
Refractive optical lens with high transmittance rate.
Elegant and attractive design.
US bridgelux high-lumen integrating encapsulated LED chip.
Taiwan meanwell power supply(UL listed), reliable and stable.
Environmental friendly and energy-saving. Contains no mercury lead. Consume 50%-70% less power than HID high bay light.
 
 
Additional Information
Payment Terms L/C, T/T, Western Union, Others
Minimum Order 10
Lead Time Delivery Time 15 days
Sample Available Yes Ask For Sample
Delivery Details 30 deposit, balance will be payable before loading.
FOB Port Shenzhen
Loading Info According to the customer\'s requirements
Packing Info According to the customer\'s requirements
Target Market(s) Africa(except Middle East),  Central & Southern Asia,  Eastern Europe,  Hong Kong/ Macao/ Taiwan,  Japan & Korea,  Latin America,  Mainland China,  Middle East,  North America,  Northern Europe,  Oceania,  Southeast Asia,  Western & Southern Europe

Contact Person
Rose 
SKype ID:: yangfan9012

Additional Information

Payment Terms Western Union, Money Order, Paypal
Minimum Order 1
Lead Time / Delivery Time 3 Day(s)
Sample Available YES
Delivery Details EXW
FOB Port Shenzhen
Loading Info By sea/By air
Packing Info 4PCs/Carton for radiator
Target Market(s) North America, Oceania, Southeast Asia, Eastern Europe, Africa(except Middle East), Hong Kong/ Macao/ Taiwan, Latin America, Japan & Korea, Mainland China, Western & Southern Europe, Northern Europe, Central & Southern Asia

Send your message to this supplier

  • Mr. Zoe

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords