Basic Specification
Life | 50000hrs |
---|---|
Package | Yes |
Tube Diameter | T8 |
Length | 120cm |
Lamp Base | G13 |
Color Tones | Cool Color |
Power | 18w |
Illuminant | SMD |
Light Source Chip | CREE |
Voltage | 220V |
Detail Description
2012 japanese led tube T8
Specification
Input Voltage |
AC85V~265V |
Frequency Range |
50Hz~60Hz |
Total Harmonic Distortion |
≤ 9 % |
Power Factor |
>0.9 |
Power Efficiency |
>90 % |
Led Consumption |
18 W |
System Consumption |
19.5W |
LED Luminous Efficiency |
100Lm /W |
LED Initial Flux |
1800lm |
Lamp’s Efficiency |
90% |
Color Temperature |
2800K~8500K |
Color Rendering Index |
Ra>75 |
Light Distribution |
Symmetric/circular spot |
LED Junction Temperature |
≤70°C |
Working Temperature |
-40°C ~ +65°C |
Storage Temperature |
-25°C ~ +65°C(25°C Best) |
IP Grade |
IP20 |
Net Weight |
0.58Kg |
Working Life-span |
50000H |
Wiring |
Refer to the label or following diagram |
The color of the lamp shell |
Milky /Transparent PC cover |
Silvery aluminum housing | |
Certificates |
CE, RoHS |
Advantage:
1. Energy conservation: compared with fluorescent tube, led tube save > 65% energy
2. Breakage resistance: Front side with PC and backside with Aluminum
3. Isolated power supply inside makes t8 led tube much more safe
4. Eco-friendly: no UV or RF interference, no Mercury or lead
5. Adopt Aluminum PCB for much better heat dissipation
6. Lumen maintenance: 70% remain after 30,000hours
7. No flicking, no humming, lower maintenance costs
8. Runs cool, hatter-proof, moisture resistant
Application
It is widely used in the following occasion and project. They are wine shop, bars, corridor, marketplace, washing room, western restaurant, museum, exhibition hall, signs, storehouse, indoor lighting, atmosphere creation etc.
Trade Terms
1. Payment Terms: 30% deposit, the balance will be paid before shipment
(PayPal, western union is available for sample orders)
2. MOQ: 20pcs, less than 20pcs will be charged 5% sample fee
3. Production leads time for 100-1000pcs:7-15 working days
5. Shipping port: Shenzhen, by DHL/UPS/FEDEX,etc
6. Samples can be delivered in 3-5 working days
Installation
[Pictures]
Additional Information
Payment Terms | L/C, T/T, Western Union, Paypal |
---|---|
Minimum Order | 25 |
Lead Time / Delivery Time | 7 Day(s) |
Sample Available | NO |
Delivery Details | 7~15 working days |
FOB Port | Shenzhen |
Loading Info | UPS/DHL/Fedrex/TNT/EMS for options |
Packing Info | Each tube in be put into a inner box, each 20 inner boxes will be put into a carton |
Target Market(s) | Africa(except Middle East), Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan & Korea, Latin America, Middle East, North America, Northern Europe, Oceania, Central & Southern Asia, Southeast Asia, Western & Southern Europe |
Related Keywords