FY Lighting Co., Ltd.
FY Lighting Co., Ltd.
Supply DLC CSA  347V LED Tube t8 from China factory
  • Supply DLC CSA  347V LED Tube t8 from China factory
Supply DLC CSA  347V LED Tube t8 from China factory

Supply DLC CSA 347V LED Tube t8 from China factory

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description
  • Product Details

Basic Specification

PFC >0.95
THD <20%
Voltage: 100-277v.277-347v
PC Lens: Clear/striped/frosted
Endcap G13/R17/FA8
Life 50,000hrs
Package Yes
Light Source Chip Epistar
Tube Diameter T8
Voltage 380V
Length 120cm
Lamp Base G13
Power 18w
Illuminant SMD
Color Tones Pure White

Detail Description

Supply DLC CSA  347V LED Tube t8 from China factory


1.Specification of  347v led tube:

Model FY-T8-1200ES
Size [mm] 1200/26
Input Voltages [V] 120~277V,277v-347v
Power 18W
CRI [Ra] 70~75
Beam angle 120°
CCT 2700K-7000K
LED type  SMD 3528/2835
LED quality 288 pcs
Efficiency  120 lm/w
Luminous Flux (L series) 2000 lm
Material PC+Aluminum 
Power Factors ≥0.95
THD <15%
Operating temperature -25-40
Lifetime 50,000 hours
Warranty 3 or 5 years warranty



Advantage:
1. High luminous efficiency up to 120lm per watt , and high illumination up to 80lux/3m height

2. Top quality material for excellent heat dissipation performance

3. Good for heat releasingAluminum board and aluminum housing guarantee  double  heat  releasing  avoid  light  depreciation  and  prolong 

lifespan up to 50,000 hours 

4. Top safety: Isolated driver

5LM80 LM79 test report, IES file 

 

Strict quality control , ISO9001-2008 certificate

Strict quality control: 72hrs burn-in test before shipment,low failure rate within 3‰

A series of testing like shaking test, low and high temperature test (-20°C~ 65 °C)

drop test from the height of 1.2m in 6  directions, hi-pot test 1500V for 1 min and so on.


Burn-in test

1.  24hrs for burn-in light source

2.  24hrs-48hrs for burn-in drivers and shorts

3.  48hrs-72hrs for burn-in leakage

4 . 48hrs-72hrs for burn-in IC,compacitor and resistor 


Application,


 

Additional Information

Payment Terms L/C, T/T, D/A, D/P, Credit Card, Western Union, Money Order, Paypal, Others
Minimum Order 1
Lead Time / Delivery Time 7 Day(s)
Sample Available YES
Delivery Details DLC CSA 347V LED TubeFor samples:5-8daysFor large orded:5-15days
FOB Port Shenzhen
Loading Info DLC CSA 347V LED Tubeby express / air / sea .
Packing Info DLC CSA 347V LED Tube8ft led tube,20pcs/carton.250*25*21cm/carton
Target Market(s) North America, Hong Kong/ Macao/ Taiwan, Western & Southern Europe, Northern Europe

Send your message to this supplier

  • Mr. Jingqi

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords