Shenzhen Zhongxin Lighting Technology Co., Ltd.
Shenzhen Zhongxin Lighting Technology Co., Ltd.
High Power Factor With External AC Power Supply T8 LED Tube Light
  • High Power Factor With External AC Power Supply T8 LED Tube Light
High Power Factor With External AC Power Supply T8 LED Tube Light

High Power Factor With External AC Power Supply T8 LED Tube Light

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description
  • Product Details

Basic Specification

Lumen 1000lm
size 600*30mm
Certification CE,ROHS,PSE
Led Quantity 102pcs
Warrranty 3 years
Life 50000
Package Yes
Tube Diameter T8
Color Tones Warm Color
Lamp Base G13
Length 60cm
Illuminant SMD
Light Source Chip CREE
Power 10w

Detail Description

Benefits: 
> Replacement for 40W T10 Fluorescent Tubes
> Adopt popular SMD3528 LED
> Good quality aluminum alloy for PCB and shell, has good heat dissipation ability
> PC cover with optical effects, have different types: Transparent, Frosted, Fringe ect.
> Steady driver power insures the tube working steadily.
> No RF interference, no flickering or buzzing.
> Quick and easy installation to minimize retrofit costs.
> Work without ballast, instant start without flickering.

Installations: 
> Direct replacement installation
> AC Power supply installtion
> Easy installation------connect any two pins of the tube,Either one end or both end are available
> Safe installation--------During the installation.It\'s safe even touch the free pins by naked hands,has no electronic shock..

Trade Terms:
· >Payment: T/T, (30% deposit, the balance paid before shipping).
· >Lead time: 8-10 working days for 100~500pcs, 15 working days for more.
· >Samples can be available within 6-8 working days
· >Shipping way at customer\'s requested
· >Shipping port: Shenzhen, China mainland

Services advantages:
· >Our sales team vibrant, professional, dedicated.
· >We have already possessed advanced production equipment, first -class production technology.
· >We have a wealth of OEM and ODM orders for production experience, each of you orders will be a very reliable quality assurance and professional service.
· >A reasonable price, a sound financial system

Additional Information

Payment Terms T/T, Others
Minimum Order 10PCS
Lead Time / Delivery Time 15 Day(s)
Sample Available YES
Delivery Details FOB/CIF. 5-10 working days after receipt of deposit.
FOB Port Shenzhen
Loading Info By sea, by air
Packing Info 20 PCS in a carton G.W.:10.8KGS Carton MEAS:604.7*20.5*17cm
Target Market(s) Africa(except Middle East), Japan & Korea, Latin America, Oceania, Central & Southern Asia, Western & Southern Europe

Send your message to this supplier

  • Mr. Nicole

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords