Shenzhen Chip Optech Co., Ltd.
Shenzhen Chip Optech Co., Ltd.
7w Quick Lgniting LED Bulb Light
  • 7w Quick Lgniting LED Bulb Light
  • 7w Quick Lgniting LED Bulb Light
  • 7w Quick Lgniting LED Bulb Light
  • 7w Quick Lgniting LED Bulb Light
7w Quick Lgniting LED Bulb Light
7w Quick Lgniting LED Bulb Light
7w Quick Lgniting LED Bulb Light
7w Quick Lgniting LED Bulb Light

7w Quick Lgniting LED Bulb Light

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description
  • Product Details

Basic Specification

Power efficiency ≥0.75
Lifespan ≥50000H
Led quantity 7*1w
Luminous efficiency 400LM/W
Frequency 50/60HZ
Life ≥50000hours
Power 7W
Color Tones Warm Color
Voltage 220V
Material PC
Dimmable Yes
Illuminant SMD
Lamp Holder E27, JDR
Shape Mushroom Shape
Power Storage or Not Yes
Package Yes
Lamp Base E27
Light Source Chip LUXEON

Detail Description

 Model NO.:CLB70-07E27A101

Product Feature:
1. Good quality dissipation aluminum and high transmitting pc cover to make, high lm and lux.
2. The temperature on the surface is much lower than the traditional bulb, more safety.
3. High efficient instant power supply to match, AC85-265V voltage range, stable performance.
4. No flickering, glare, uv, infrared ray and no harmful for human.
5. Low light degradation, long lifespan.
6. Dimmable design, available for traditional bulb.

 

 

 
Technology Parameter
 
 

 Model CLB70-07E27A101
Working voltage 85-265V
Current   315-335mA
Power consumption 7W
Frequency 50/60HZ
Power Factor ≥0.8
CRI(ra) ≥0.7
Luminous flux 380-420LM
  Luminous efficiency  40LM/W
Led quantity   7x1W
Color temp.  Cold white /pure white / warm white
Size  ¢60*H115MM
Lifespan ≥50000H
N.W.  113g
Power efficiency  ≥0.75
Withstand Voltage ≥3.75KV
Housing type  Frosted 
Wire connection method  The same as the traditional bulb 

Application:
Avenue, restaurant, office, home, decoratetion lighing, passagerway.

 

Certification:
UL/TUV/CE/PSE/FCC/CCC approval.

Installation:


1. Cut off power, take off traditional bulb from the base.
2. Install led bulb light, switch on  powe.


Additional Information

Payment Terms T/T
Minimum Order 1pieces
Lead Time / Delivery Time 7 Day(s)
Sample Available YES
Delivery Details FOB
FOB Port Shenzhen
Target Market(s) Africa(except Middle East), Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan & Korea, Latin America, Mainland China, Middle East, North America, Northern Europe, Oceania, Central & Southern Asia, Southeast Asia, Western & Southern Europe

Send your message to this supplier

  • Mr. Han

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords