
CE ROHS 12000LM replace 450w hps led tunnel light 150w
Your message must be between 20 to 2000 characters
Contact NowBasic Specification
replacement | 450w hps |
---|---|
Voltage | 90-260V |
Application | Advertising Lighting |
Light Source | LED Lamp |
Material | Acrylic, Aluminum, Aluminum Die Casting |
Finishing Color | White |
IP | IP66 |
Detail Description
CE ROHS 12000LM low price led tunnel lighting 150w
Specification:
1) 150W Led turnnel Light Source: 1*150W LED
2) 150W Led turnnel flood light
Luminous Flux: 12000LM Epivalley LED Chip
3) Rated Wattage: 167W
4) Base: 2 PINS
5) Rated Voltage:100-240VAC , 50/60Hz
6) Color Temperature: WW(2700~3800K), NW(4000-5000K) or CW(5500-6700K)
7) Beam Angle: 120°
8) Lifetime: 50,000Hours
9)Size:760*285*93mm
10) Net weight:15KG
11) CE,ROHS approved
12) Body Temperature: <70 °C @Ta=25 °C
13) 80W Led turnnel recommended replaced bulb Metal Halide Lamp 450w
14)IP Rating:IP65
Quality assurance:
New Sunshine Manufacturing Co., Ltd guarantee that all of the LED lights being sold are QC passed, and reached the standard for shipment for 2 years guaranty. Specific warranty as follows:
Under normal use, lamp is verified to be the quality problem by NS or the third-party testing authority, NS will offer exchange service within six months from Date Code, beyond six months NS will offer free repair service in the guaranty time. Shipping freight caused by the warranty process will be born by the shipper. NS will charge for the parts and shipping freight for maintenance service beyond guaranty. The production date is subject to the Date Code on the products.
The following situation is beyond service for free:
1.The products have been beyond warranty.
2.Damage created by disassembly, service, refit without New Sunshine\'s authorization.
3.Breakdown caused by installation or operation without according to the specification.
4. Breakdown caused by move or fall, water seepage, or scoring.
5.Damage created by the irresistible force factor, such as fire, earthquake, thunder and lightning. etc.
6 It’s the normal phenomenon that one or two lamps have 0.1%-0.2% LED chips burned up, such lamps will not be including in the range of repair or exchange.
Delivery:
1.Production Lead Time: 3-5 business days for samples, and 7-10 business days for large quantity after receipt of payment.
2.Private labeling, colorful package and distributorship are often under discussion. Our aim is to meet your requirements.
3.Our own design and product development without any patent problem.(CE ROHS FCC PSE and ETL TUV for some featured products)
4.The goods will be delivered to you by air ,sea etc. according to your needs. As to the carrier, you can choose DHL UPS FEDEX TNT,etc. Bargaining with forwarders for the best freightfor you is what we usually do.
5.Welcome you to visit our lighting showroom and factory.
Our service :
1.Your inquiry related to our products or prices will be replied in 24hrs.We always believe: large quantity, then low prices.
2.Well-trained and experienced staffs to answer all your enquires in fluent English.. We always focusing on quality, and promise what we do are high quality products.
3.OEM&ODM, any your customized lightings we can help you to design and put into products.
4. We can provide you any information about the products, such as price list, specification leaflets and IES file, light source test report and heat test report.
Additional Information
Payment Terms | T/T |
---|---|
Minimum Order | 1 |
Lead Time / Delivery Time | 3 Day(s) |
Sample Available | YES |
Delivery Details | samples in 3 days ,50-500pcs in 10 days |
FOB Port | Shenzhen |
Loading Info | by sea,UPS,DHL,FEDEX |
Packing Info | 2PCS/CTN16KG50*38*38CM |
Target Market(s) | Eastern Europe, Latin America, Middle East, North America, Northern Europe, Oceania, Western & Southern Europe |
Related Keywords