Shenzhen H&C Opto-electronics Co.Ltd.
Shenzhen H&C Opto-electronics Co.Ltd.
Hot sell t8 new led bulb 15W led lamp with CE RoHS C-Tick PSE FCC
  • Hot sell t8 new led bulb 15W led lamp with CE RoHS C-Tick PSE FCC
Hot sell t8 new led bulb 15W led lamp with CE RoHS C-Tick PSE FCC

Hot sell t8 new led bulb 15W led lamp with CE RoHS C-Tick PSE FCC

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description
  • Product Details

Basic Specification

Packaging Carton
Emitting Color WW/PW/CW/NW
Housing Lampshade PC+Aluminum
Cover Milky/Striped/Clear
Place of Origin Guangdong China(Shenzhen)
Life 50000Hs lamp
Package Yes
Light Source Chip Epistar
Tube Diameter T8
Length 120cm
Lamp Base G13
Illuminant SMD
Voltage 110-220V
Color Tones Pure White
Power 15w lamp

Detail Description




1. Details:(new led bulb)

Product Technical Parameters:

Product Model HC-T8-60-9W HC-T8-90-13W HC-T8-120-12W HC-T8-120-15W
Input Voltage AC85-265V AC85-265V AC85-256V AC85-256V
Rated Power 9W 13W 12W 15W
Dimension ¢26*598MM ¢26*898MM ¢26*1198MM ¢26*1198MM
LED Quantity 48PCS 72PCS 96PCS 96PCS
CRI 75-80/80-85 75-80/80-85 75-80/80-85 75-80/80-85
Luminous Flux 800-1100lm 1200-1500lm 1100-1500lm 1400-1800lm
Operating Temp -10℃-50℃ -10℃-50℃ -10℃-50℃ -10℃-50℃
Case Temp MAX.80℃ MAX.80℃ MAX.80℃ MAX.80℃





2. HC-LED tube Features(new led bulb:

1. Environment friendly and energy saving, long lifespan, high brightness, good color rendering and low power consumption
2. High quality LED as the light source,such as\"CREE\"\"OSRAM\"\"NICHIA\"\"EPSTAR\" and some others

3. Using aluminum heat sink base and aluminum PCB to dissipate more heat
4.Widely used for indoor lighting, hotel, restaurant, shops, business lighting, home lighting, etc.
5. Available for clear, milky and diffusion cover
6. CE RoHS PSE C-Tick FCC Approval
7. Easy to install and use


led tube advantages:
1.Green Lighting:green lamp without Bp and Hg
2.Using high quality and high brightness LED as lighting source
3.Up to 50000hs life span, more than 10 times the life of traditional flourescent tube

4.Energy saving and environment friendly, no noise



3. Services:

1. Your inquiry related to our products or prices will be replied in 24hours.
2. Well-trained and experienced staffs to answer all your enquires in fluent English
3. OEM&ODM, we can help you to design and produce any of your customized lightings . 
4. Distributorship are offered for your unique design and some our current models
5. Protection of your sales area, ideas of design and all your private information.



4. Installation Instructions:

1. Cut off the original line power before installation
2. LED tube lights can be installed directly in the T8 or T10 bracket(remove the starter)
3. If there is an electronic ballast, it can\'t be installed directly, you should get rid of eletronic ballast
4. Non-professionals should not disassemble the LED lamp by themselves
5. If there is any unusal problem when using, please contact us. The product couldn\'t be open optionally, or no warranty for it.


 
A .When installing LED tube to the hanger with inductive ballast:
1. Take out the starter from the hanger
2.Install the LED tube into the hanger directly(Refer to the following drawing)


To save energy, you are recommended to remove the inductive ballast. Or there will be 1-2w electricity consumption.

B. Installing LED to the hanger with Electronic ballst:
1.Take down the electronic ballast from the lamp hanger
2. Connect the wire. (Refer to the following drawing)

3. Install the LED tube into the hanger directly.




5. Usage Instructions:

1. Take out package and check it carefully. If there is any problem, contact us directly.
2.Read the lable paremeter carefully to make sure:
     the LED tube parameter is match with the fixture paremeter
     the connect way is the same with the tube connect way(pay attention to        double-end currency input and single-end currency input tube)
3. Read the instruction carefully before install it.
4.Don\'t store tubes in humidity environment




6. Applications:
 
1) Indoor lighting   (living room, bedroom, kitchen, washroom)
2) Subway, bus, station, parking lot, tunnel, lobby
3) Office building, shops, shopping mall, supermarket,production line lighting in factory
4) School, hospital, exhibition hall, hotel, commercial complex
5) Advertisement lighting and decoration  

Application Case:





7. Packing Specifications:

 
Delivery Time: 3workdays for sample, 5-7workdays for batches.
 


8. Delivery:

For your samples order, we usually deliver by FEDEX, DHL, UPS, or by air transportation
If more than 40 cartons, we recommend sea shipment to save transportation fee




Why chose us?
  • Brand advantage: We pay attention to shape our own brand from the beginning, to enhance the brand reputation and popularity, to obtain many honors in the industry.
  •  Product Advantage: In order to the development of the enterprise and also the LED lighting industry. HC R&D continuously research and innovate, develop more new products.
  • Innovation advantage: The aggressive exploration and innovation to research more functional products, meet customers\' different requirements, make the company a leader of LED lighting industry.
  • Service advantage: HC people committed to development of LED lighting industry with our sincerity and fortitude, we always adhere to “Integrity management, People-oriented”  with respect to our aim, win the support and trust of the majority people in LED industry at home and abroad.


Special design of end-cap:
  • Design of removable and rotatable end-cap provides quick replacement 
  • Lighting angle can be ajusted according to customers\' needs
  • Designed by our R&D team, and easy to adjust
  • Of inner-transformer by pressing the switch on the end caps easily. 
Top Quality PC covers:
1. Clear, milky white and difussion cover available
2. PC cover is of high transmittance, for difusion cover when lighted on, LEDs are invisible. 
3. Normally, lighting efficiency is very even.


Great Lighting source:
we choose high quality led chip of bigger size: 14*28mil.
the lighting space is bigger, and the whole led tube lumen is higher.


Low light degradation:
1. Our led Production Process adopts new technology, less than 0.3% in the first year,(according to our 3years warranty)
 

High quality power supply:
1. We have our own R&D team to Research the driver solution: isolated power supply and non-isolated power supply.
2. PF can reach more than 0.95.



1. CE/LVD and CE/EMC Approval in European market, TUV Approval in German Market.
2. Rosh FCC C
-Tick Approval to satisfy customers
 





More pictures for your reference:

Additional Information

Payment Terms T/T, Credit Card, Western Union, Paypal, Others
Minimum Order 20pcs small trial order
Lead Time / Delivery Time 10 Day(s)
Sample Available YES
Delivery Details EXW Price 7-15days(according to your amount)
FOB Port Shenzhen
Loading Info By sea/airUPS, DHL, Fedex and other shipping.
Packing Info Pearl cotton (Carton) 129*24*25cmPaper tube (Carton) 127*24.5*24.5 cm
Target Market(s) Africa(except Middle East), Central & Southern Asia, Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan & Korea, Latin America, Mainland China, Middle East, North America, Northern Europe, Oceania, Southeast Asia, Western & Southern Europe

Send your message to this supplier

  • Mr. Mary

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords