Shenzhen JDY Energy-saving Technology Co., Ltd.
Shenzhen JDY Energy-saving Technology Co., Ltd.
600mm 8W LED T8 tube light
  • 600mm 8W LED T8 tube light
600mm 8W LED T8 tube light

600mm 8W LED T8 tube light

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description
  • Product Details

Basic Specification

Power 8W
Life 30000 + hours
Package Yes
Tube Diameter T8
Lamp Base G13
Length 60cm
Illuminant SMD
Voltage 220V

Detail Description

 

Product description:

Input voltage: AC95-265V/50-60HZ

Power: 8W

Color temperature: 3000-6500K

Luminous flux: 600-760lm

Beam angle: 180 Degrees(include round rotating and U-type base type)

Measurement: L588*D26±1MM

Matrial:  PC+Aluminum

LED Qty: 128pcs 

Tube type: T8

 

LED TUBE LIGHT 180DEGREES
600mm 900mm 1200mm
8W 10W 10W 12W 15W 15W 18W (R)
SMD3528 SMD3528 SMD3014 SMD3528 SMD3528 SMD3528 SMD 3528
600-700 lm 750-960 lm 750-960  lm 900-1150 lm 1120-1450 lm 1120-1450lm 1350-1700lm
T8 T8 T8 T8 T8 T8 T8 rotating 
 3000-6500K                 180degrees.   Aluminum+ PC
1200mm 1500mm
18W 20W 20W 22W 25W
SMD 3014 SMD 3528 SMD3528 SMD3528 SMD3014
1700-2000lm 1500-1900lm 1500-1900lm 1650-2050lm 2100-2500lm
T8 rotating  T8 T8 T8 T8
3000-6500K 180degrees.  Aluminum+ PC

(1) Power Saving & Environment Friendly
LED tube can save energy more than 70%, no pollution, green illumination
(2) Long Lifetime & Stable Working
Low voltage power driving, protective for power,life time more than 30000 hours
(3) UV-anti & Low Thermal Radiation
Constant-current power supply made the effect
(4) High Brightness & Low Brightness Declinces & Quanlity Ray
Using good quality LED chip and good quality power supply made a excellent performers of tube
(5) High Power Factor More than 90
Protective with Power Net, Accordance with National Standard
(6) Safety and Convenient for Installation
Isolation treatment for tube head, Safety assured

  • Accpet ODM and OEM

  • Reply in 12hours

  • Delivery in 7-12days

  • overall after-all service

    The pictures are the base holder of our tube light

    Additional Information

    Payment Terms L/C, T/T, Western Union, Others
    Minimum Order 100
    Lead Time / Delivery Time 12 Day(s)
    Sample Available YES
    Delivery Details EXW, FOB
    FOB Port Shenzhen
    Loading Info Delievry by forwarder, or other express
    Packing Info carton, packet by your required
    Target Market(s) Africa(except Middle East), Eastern Europe, Latin America, Middle East, North America, Northern Europe, Oceania, Central & Southern Asia, Southeast Asia, Western & Southern Europe

    Send your message to this supplier

    • Mr. Ashley

    • Enter between 20 to 4,000 characters.

    Related Keywords

    Related Keywords