Basic Info
Basic Info
Product Description
Product Description
Product Name: 2G11 led pl lamps
Model No.:SW-2G11-150W9
Basic information for this 2g11 pl led tubs:
Model No.:SW-2G11-150W9
Basic information for this 2g11 pl led tubs:
Item No: | SW-2G11-150W9 |
Power: | 9w |
Voltage: | AC85--265V |
LED Quantity: | 150pcs 3528smd |
LED luminous: | 850-900LM |
Frequency: | 50-60HZ |
Constant current error: | <3% |
Static power consumption: | 0.3W |
Power factor: | >97% |
Color temperature: | 2700~7000k |
Material: | Aluminum+PC |
Package: | 25/CTN |
Size of 2g11 led:
Products features of this 2g11 pl led tube:
1. Color consistency high, low-power, low-light decline, long lifespan, good brightness;
2. Use RoHS aluminum, fully solve the LED heat transport problem, so that the lamp can keep in top working condition;
3. High-precision constant current drive, which can extend the LED lifespan;
4. Good material of lens to ensure the best light transmission;
5. No UV or IR radiation, Environment friendly.
6. CE, RoHS approved.
2. Remove old Fluorescent tubes
3. Access the ballast by removing ballast cover
4. Disconnect and cut wires feeding to the ballast input (live and neutral wires) they should remain as long as possible
5. Disconnect and cut the wires from the ballast output to the sockets (cut wires close to the ballast)
6. Connect the 2 socket wires to the 2 input wires (live and neutral)
7. Install ballast cover and LED tubes, turn power on.
Pictures of this 2g11 pl led tube lights:




2. Use RoHS aluminum, fully solve the LED heat transport problem, so that the lamp can keep in top working condition;
3. High-precision constant current drive, which can extend the LED lifespan;
4. Good material of lens to ensure the best light transmission;
5. No UV or IR radiation, Environment friendly.
6. CE, RoHS approved.
2g11 led pl lamps installation:
1. Turn off power2. Remove old Fluorescent tubes
3. Access the ballast by removing ballast cover
4. Disconnect and cut wires feeding to the ballast input (live and neutral wires) they should remain as long as possible
5. Disconnect and cut the wires from the ballast output to the sockets (cut wires close to the ballast)
6. Connect the 2 socket wires to the 2 input wires (live and neutral)
7. Install ballast cover and LED tubes, turn power on.
Pictures of this 2g11 pl led tube lights:





Related Keywords
Related Keywords